PlugSolar
State law tracker

Is plug-in solar legal in California?

Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.

Our verdict: Soon

Law passed Takes effect January 1, 2027 Checked November 15, 2026

California's SB 868, signed September 30, 2026 and in effect January 1, 2027, lets households use certified plug-in solar up to 1,200 W AC per dwelling with no utility approval or fees; utilities may require only an online registration. The exemption ends January 1, 2030 unless the Legislature extends it, and there are no landlord or HOA protections.

Is plug-in solar legal in California?
Illustration: AI-generated image, not a product photo.
On this page
  1. What counts as a plug-in system under SB 868
  2. What your utility can and can't ask
  3. When the law starts and when it runs out
  4. Why net metering and the Net Billing Tariff don't apply
  5. What a kit could save in California
  6. Renters and HOAs: what SB 868 leaves alone
  7. What to do now and on January 1

Not yet. SB 868, California's plug-in solar law, was signed on September 30, 2026, but it doesn't take effect until January 1, 2027. Before that date, a kit you plug in gets no exemption from your utility's interconnection rules.

What counts as a plug-in system under SB 868

Under Section 8530(c) of the Public Utilities Code, a "portable solar generation device" is one solar device, or a combination of them, that passes six tests. Its maximum aggregated AC output is 1,200 watts or less per dwelling. It is built to connect to and disconnect from the building's wiring through a receptacle. Its purpose is to offset the power used on site. It meets the latest National Electrical Code and California Electrical Code. UL or an equivalent nationally recognized testing laboratory has certified it as a plug-in photovoltaic system. And a certified feature isolates it from the building, so it can't feed the grid in an outage.

The cap counts per dwelling, so two kits in one apartment share one 1,200 W. It applies to the inverters' AC output, not the panels' rating. Some summaries write "a single outlet" or "a standard outlet", but the law says only "a receptacle".

Read the certification test closely. The law wants the whole system certified as a plug-in system. A listing for the microinverter alone, the small box that turns the panels' DC power into the AC your outlet uses, doesn't meet that. SB 868 names no standard, but PG&E tells customers to look for products that identify the entire system as certified to UL 3700, UL's safety outline for plug-in solar. Fail any one of the six conditions and none of the law's exemptions apply (Section 8531(d)).

What your utility can and can't ask

Once the law takes effect, a qualifying device is exempt from every interconnection requirement, including the interconnection agreement rooftop solar owners sign (Section 8531(a)). Your utility can't require its approval, charge a fee for the device or the power it feeds into your home, or make you add equipment beyond what's built in (Section 8531(b)).

It can have you register the device on a simple online form: your address and the device's make, model and size. That notice can't be turned into an approval (Section 8531(c)). The rule reaches investor-owned utilities such as PG&E, SCE and SDG&E, and publicly owned ones such as LADWP and SMUD.

PG&E will require the notice and plans to open its form on January 1, 2027. Until then, it takes details and questions at [email protected]. On November 16, 2026, we found no plug-in solar page from SCE, SDG&E, LADWP or SMUD.

When the law starts and when it runs out

SB 868 has no urgency clause. Article IV, section 8(c) of the California Constitution puts a regular-session statute into effect on the January 1 after a 90-day period from enactment. Ninety days from September 30 is December 29, so the date is January 1, 2027. The Legislature's 2026 calendar gives the same day for that year's statutes.

Section 8531, the part with the exemption and the limits on utilities, is repealed on January 1, 2030, unless the Legislature extends it. That same day, Section 8532 takes over: no receptacle-connected solar device that misses the code, system certification and isolation conditions may be sold in California.

Why net metering and the Net Billing Tariff don't apply

Rooftop solar earns credit for exported power through net metering (NEM) or the Net Billing Tariff (NBT), which the utilities call the "Solar Billing Plan". Since April 15, 2023, the CPUC has put customers who apply for interconnection on the NBT. A plug-in device skips interconnection, and SB 868 defines it as meant to offset your own use.

PG&E says customers get no bill credits for what a plug-in system exports. If rooftop solar is already on your house, PG&E is still deciding how a plug-in system affects your NEM or NBT eligibility, and it plans guidance before January 1, 2027.

Nor does a plug-in system give backup power: a qualifying one shuts off in an outage. And in PG&E's reading, battery systems fall outside the exemption and still need interconnection. The law's text doesn't mention batteries.

What a kit could save in California

Your saving is the solar power you use yourself, times your rate. California's average residential price was 32.58¢ per kWh for January through August 2026, against 18.19¢ for the US (EIA). Our calculator starts from 1,797 kWh a year per kW for Los Angeles (Global Solar Atlas), subtracts 10% for shade and dirt, adjusts for direction and assumes you use 70%. The table uses an 800 W kit at the calculator's default $700, an assumption rather than what a qualifying kit costs.

Placement (800 W kit)Production a yearSavings a yearPayback
South, tilted1,294 kWh$2952.4 years
South-east or south-west1,229 kWh$2802.5 years
East or west1,035 kWh$2363.0 years
Vertical, south railing906 kWh$2073.4 years
Vertical, east or west railing712 kWh$1624.3 years

The south railing row: 0.8 kW × 1,797 × 0.7 × 0.9 = 906 kWh. Using 70% of that, 634 kWh, saves 634 × $0.3258 = $207 a year, and $700 ÷ $207 = 3.4 years.

On a time-of-use plan, midday solar can be worth less than that average. SCE's TOU-D-4-9PM plan charges 33¢ per kWh on summer weekdays before 4 p.m. and 59¢ from 4 to 9 p.m. Within your baseline allowance those drop to 24¢ and 50¢. If all of a south railing's power counts at 24¢, it saves $152 a year and pays back in 4.6 years.

PG&E's estimate for a 1.2 kW system is $50 to $800 a year. A shaded spot or a home empty all day lands near the low end. Run your own numbers in the savings calculator.

Renters and HOAs: what SB 868 leaves alone

SB 868 is silent on landlords, leases, homeowners associations and CC&Rs. Ask before you mount anything, and get the answer in writing. Our renters guide has more.

What to do now and on January 1

  1. Hold off on plugging a kit into your home's wiring until January 1, 2027.
  2. Before you buy, confirm the whole system, not just the microinverter, is certified as a plug-in photovoltaic system by UL or another nationally recognized lab, with a certified anti-backfeed feature.
  3. Keep your home's total AC output at 1,200 W or less.
  4. If you rent or live under an HOA, get permission in writing.
  5. Register if your utility asks.
  6. If you have rooftop solar, wait for your utility's NEM or NBT guidance.
  7. Plug the system's cord straight into a wall outlet.

Use only certified equipment, never an unlisted inverter. And never run the system through a power strip or extension cord.

More on outlets and circuits is in our safety guide, the basics in how plug-in solar works, and other states in the state guide.

Sources

  1. SB-868 Electricity: portable solar generation devices., California State Legislature, 2026-09-30.
  2. California Code, CONS SEC. 8., California State Legislature, 2025.
  3. 2026 Tentative Legislative Calendar, California State Senate, 2026-03-27.
  4. California Code, PUC 224.3., California State Legislature, 2008.
  5. Plug-In Solar Is Coming to California. Here's What PG&E Customers Should Know, PG&E, 2026-10-14.
  6. California legalized balcony solar, here's what homeowners should know, pv magazine USA, 2026-10-21.
  7. About Us, SMUD, 2026.
  8. Net Energy Metering and Net Billing, California Public Utilities Commission, 2026.
  9. Electric Power Monthly, Table 5.6.B: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, Year-to-Date, U.S. Energy Information Administration, 2026-10-23.
  10. Specific photovoltaic power output (PVOUT), crystalline silicon at optimum tilt, Global Solar Atlas (World Bank Group, Solargis), 2025.
  11. Time of Use Plans, Southern California Edison, 2026.
  12. UL Solutions Debuts Testing and Certification Framework for Safer Plug-In Solar Across the United States, UL Solutions, 2026-01-08.
  13. Plug-in solar panels: safety advice for residents and homeowners, London Fire Brigade, 2026.

Read next

Tool

Plug-in solar payback calculator

How many years until a kit has paid for itself? Your electricity rate and how much of the power you use yourself matter most. Every assumption is listed below the results.

Updated Nov 15, 2026