Law passedIn effect since August 12, 2026Checked November 15, 2026
Colorado's HB26-1007 (signed May 7, 2026, in effect August 12, 2026) has the highest cap in the country: one NRTL-listed plug-in system per address supplying up to 1,920 W to the grid, with no utility approval or fees, though the utility may ask for notice of its size. Its protections against landlord and HOA bans and its ban on selling unlisted devices above 391 W start January 1, 2027.
The lawHB26-1007 (2026)
Size limit1,920 W
ListingListed by a recognized test lab
Your utilityNo approval or fee; notice may be required
Renters and HOAsHOAs can't unreasonably ban (from 2027)
What the law says
Size limit: 1,920 W: a single PV system per address designed or commissioned to supply a maximum of 1,920 W to the electric grid. Only one device per wall outlet per address.
Equipment: Labeled and listed by an NRTL. A device of 391 W or less is exempt from the solar PV installation requirements in 40-2-128 and from code or listing provisions that would require rewiring. From 2027-01-01 no one may sell, lease or rent a device above 391 W in Colorado that is not UL labeled and listed.
Your utility: No utility approval, fee, or extra equipment beyond what the UL listing integrates. The utility MAY require the customer to notify it of the device's presence and size in kW. Must have anti-islanding. The utility is not liable.
Renters and HOAs: From 2027-01-01 no person may unreasonably prohibit a device, and covenants that unreasonably restrict one are void. It counts as an energy efficiency measure for common interest communities (allowed on a limited common element such as a balcony). A property owner may set reasonable restrictions (prior notice, fire or overload safety, location); an HOA may require securing and indemnification.
Also: Install per fire code and local health and safety building codes. The bill also requires utilities to accept meter collar adapters; the PUC must revise interconnection rules by 2026-12-31. Effective 90 days after adjournment (2026-08-12) unless a referendum petition was filed.
What to do now
The law is in effect. It applies since August 12, 2026.
Pick a kit that meets the rules. Stay under the size limit (1,920 W) and check the listing on the inverter itself. Our kit guides and safety guides help.
Tell your utility if the law asks you to. See the utility rule above for when and how.
Run the numbers. The payback calculator uses this state's 2026 electricity rate.
This page is a summary from our state tracker, last checked on November 15, 2026. A second, independent check against the legislature's pages followed on November 16, 2026. Found something newer? Tell us.
Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.