Plug-in solar in California: SB 868 and when you can plug in
Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.
No: a bill was filed but died.
Our verdict: No law
Bill failed
As introduced, HB 2296 defined a 'portable solar generation device' (up to 1,200 W, standard 120 V outlet) and exempted it from interconnection; the House substitute of Feb 2026 kept only other distributed-energy and rental-efficiency provisions, and the Senate later stripped the meter-collar language too. The enacted law (ch. 136, Laws of 2026, effective June 11, 2026) contains no plug-in solar provision, and the 2025-26 biennium is over, so nothing is pending; no 2027 prefile found.
This page is a summary from our state tracker, last checked on November 15, 2026. A second, independent check against the legislature's pages followed on November 16, 2026. Found something newer? Tell us.

Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.