Is plug-in solar legal in my state? The 50-state tracker
Every state and DC: the law or bill, the size limit, what you must do, and the date we last checked it.
A plug-in kit is a few panels and a microinverter that plug into a wall outlet. As of November 2026, ten states have a law for it and six are in effect; an 800 W kit saves about $75 to $295 a year.

Plug-in solar is a small kit, usually one to four panels and a microinverter, that connects to a regular 120 V wall outlet. Nobody wires it into your electrical panel. Your home uses its power first, so less of your electricity comes from the utility.
Key points
Solar panels produce direct current (DC). The microinverter, a small box behind a panel, converts it to the alternating current (AC) your outlets use. A cord carries that power into an outlet and your home's wiring.
Whatever is switched on uses the solar power before any from the grid, so the meter counts less. When the kit makes more than the house needs, the surplus flows out to the grid.
The microinverter only runs while it detects the grid. Utah's law asks for "a device or feature that prevents the system from energizing the building's electrical system during a power outage." Maine puts a number on it: the inverter must shut off 0.2 seconds after power is disrupted.
This shut-off, called anti-islanding, protects line workers during an outage. It also makes the plug's prongs go dead once you pull it.
An 800 W kit tilted south in Salt Lake City produces about 1,150 kWh a year by our calculator's method. That is roughly a tenth of the 10,791 kWh the average US home bought in 2022. Mounted upright on a railing, the same kit makes about 810 kWh.
By day, that covers what never switches off: the refrigerator, the router, devices on standby. Central air conditioning is out of reach, and so is a zero utility bill. A kit also gives you no power in a blackout, since the inverter stops when the grid does.
As of November 2026, ten states have a plug-in solar law, and six are in effect. Utah's has applied since May 7, 2025, Maryland's and Vermont's since July 1, 2026, and Maine's since July 29, 2026. Colorado followed on August 12 and Connecticut on October 1.
Four more are signed but not active yet. California, New Hampshire and Virginia start on January 1, 2027, and New Jersey on March 1, 2027. Our tracker lists every state and DC, with each bill and when we checked it.
The laws look alike. Most allow up to 1,200 W through a standard outlet. Colorado's limit is 1,920 W supplied to the grid, one system per address.
Every law wants equipment certified by UL or another nationally recognized testing laboratory, though Maine also accepts a system set up to the National Electrical Code. Maine and Vermont name the plug-in standard, UL 3700. New Jersey's names it too, pv magazine reports. The utility may not demand an interconnection agreement, its own approval, a fee or extra equipment.
They differ on telling the utility. Utah asks for no notice, while Maryland wants one before you install. Maine needs notice only above 420 W, within 30 days. In Colorado, the utility may ask for one.
In a state with no law, nothing allows plug-in solar by default. Anything that can push power into the grid usually needs permits and utility approval first, a process written for rooftop systems.
New York's legislature passed a bill in May 2026. The governor had not signed it by November 2026.
Most of the risk sits in the outlet and its circuit. Your panel's breaker measures only the current arriving from the grid. The kit pushes current into the same wire from the opposite end.
Together, the current from the utility and the kit can exceed the wire's rating without tripping the breaker. The laws' wattage caps limit how much current a kit can add. Colorado also allows one device per outlet. Above 420 W, Maine wants a dedicated circuit with a single outlet, installed by a licensed electrician. UL names dedicated circuits as one way to prevent overloads.
The plug itself is the second risk. UL warns that "accessible plug blades can become energized when exposed to sunlight." The anti-islanding shut-off is what makes them go dead.
Plug the kit directly into a wall outlet. Don't use a power strip, an extension cord or any cord with a plug at each end. None of them comes with the kit, and a manual such as Hoymiles' allows only the cables and parts the maker supplies. The CPSC warns that male-to-male cords have "exposed prongs that can become energized."

UL 3700 is UL's outline of investigation for plug-in PV equipment and systems, with a certification program since January 2026. We found no complete kit certified to it as of November 2026.
APsystems says its EZ1-LV microinverter is "CSA certified to UL 3700." Hoymiles calls its HiFlow Pro "UL 3700-compliant." EcoFlow and CraftStrom list UL 1741, the standard for inverters that connect to the grid. Our safety guides cover outlets and circuits, including GFCI protection.
On the makers' own sites in November 2026, APsystems' EZ1 microinverter costs $325 on its own, with panels and a mount extra. Bright Saver lists its 360 W kit at $432. CraftStrom asks $1,500 for its 800 W starter kit.
What you save depends on the kit's output, the share of it you use yourself and your rate. The table follows our calculator's method: the Global Solar Atlas yield for each state's largest city, minus 10% for shade and dirt. Panels upright on a railing lose another 30%.
It assumes you use 70% at home, at the state's average residential rate from the EIA for January through August 2026 (US average 18.19¢ per kWh). The $1,000 price is an example, not a quote.
| An 800 W kit in | Rate per kWh | Tilted south: kWh / savings a year | Upright on a south railing: kWh / savings a year | Payback at $1,000 |
|---|---|---|---|---|
| Utah (Salt Lake City) | 13.19¢ | 1,150 kWh / $106 | 810 kWh / $75 | 9.4 to 13.4 years |
| Maryland (Baltimore) | 21.31¢ | 1,050 kWh / $157 | 740 kWh / $110 | 6.4 to 9.1 years |
| California (Los Angeles) | 32.58¢ | 1,290 kWh / $295 | 910 kWh / $207 | 3.4 to 4.8 years |
Your rate counts for more than your sunshine. The same kit makes about 12% more power in Los Angeles than in Salt Lake City, yet saves almost three times as much there.
Power you send to the grid usually earns you nothing. Every law in effect except Colorado's and Connecticut's keeps plug-in kits out of net metering, and Vermont's adds that exports aren't paid for. In Connecticut, each kit must carry a warning that surplus power will be "charged to the customer as usage" unless your meter allows net metering.
If nobody is home by day, assume less than 70%. Panel aging and rate changes are left out. Try your own numbers in the calculator, and see the savings guides for what each input means.
The US market is still small. Most kits run on one of a few 120 V microinverters. APsystems' EZ1-LV delivers up to 900 W AC.
Hoymiles' HiFlow Pro LV sits inside Bright Saver's kits. Up to four units reach 1,200 W, each in its own outlet. EcoFlow's STREAM is sold for Utah only. Solar web shops and CraftStrom sell complete kits.
Compare AC output, the power the inverter delivers to your outlet and the figure the laws cap, rather than the panel watts on the box. Read the certification exactly as the maker words it. Our kit pages are built from published specs and certification listings; we don't test kits.
Six of the ten laws leave landlords and associations alone, so your lease and your association's rules decide. California's new law, for example, says nothing about leases or CC&Rs. The other four limit them: Vermont's already applies, and three more start in 2027.
In Vermont, you give your landlord 10 days' notice. The landlord can answer within 10 days with reasonable restrictions; without an answer, you may go ahead. Deed restrictions and covenants can't prohibit a device.
Virginia's applies from January 1, 2027. A landlord with more than four rental units can't ban a kit on the outside of your unit, but may set reasonable rules on size and placement. You give seven days' notice.
Colorado's renter rules start the same day. No one may unreasonably prohibit a device, though a property owner can require notice and set reasonable rules on location and safety. New Jersey's follows on March 1: landlords and HOAs can't broadly prohibit the devices, but may limit size and placement.
In Maine, if the building isn't yours, you restore it when you take the kit down. The renters guides cover your lease and how to ask a landlord or association.
Where a law covers it, only within one limit for the whole home. Maryland and Connecticut allow one system per electric meter, and Colorado one per address. Maine and Vermont let you add systems up to a combined 1,200 W, Maine per address and Vermont per meter. Utah's law doesn't say.
No. The residential clean energy credit doesn't cover property placed in service after December 31, 2025. Maryland's law adds that plug-in systems may not earn renewable energy credits.
Every state and DC: the law or bill, the size limit, what you must do, and the date we last checked it.
How many years until a kit has paid for itself? Your electricity rate and how much of the power you use yourself matter most. Every assumption is listed below the results.
Outlets, circuits, blackouts, UL listings and the electrical code, without scare stories.