
Plug-in solar in California: SB 868 and when you can plug in
Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.
Not yet: HB 5764 is pending.
Our verdict: Not yet
Bill pending
HB 5764 would let Michiganders use plug-in solar up to 1,200 W without utility pre-approval. It is still in the House Energy Committee with no hearing found and dies on December 31, 2026 if it does not move in lame duck.
Introduced 2026-03-19 in the 103rd Legislature (amending 2008 PA 295 by adding Sec. 115) and referred to House Committee on Energy; no hearing or vote as of 2026-11-15
This page is a summary from our state tracker, last checked on November 15, 2026. A second, independent check against the legislature's pages followed on November 16, 2026. Found something newer? Tell us.

Not yet. SB 868 is signed and starts January 1, 2027. Then a certified system of up to 1,200 W per home needs no utility approval or fee, only an online registration if your utility asks.